The table below is an overview of type certified wind
turbines that must be installed in Denmark. Depending on the certificate
date of issue the following orders from the Danish Energy Authority are
complied with:
After 01.07.2008: Order no. 651 of June
26, 2008 on the technical certification scheme for the design,
manufacture, installation, maintenance and servicing of wind turbines
Before 01.07.2008: Order
no. 1018 of August 20, 2007 on the technical certification scheme for
the design, manufacture and installation of wind turbines
Before 10.09.2007: Order
no. 1268 of December 10, 2004 on the technical certification scheme
for the design, manufacture and installation of wind turbines
Before 01.01.2005: Order no. 270 of may
2, 1991 on type approval and certification of wind turbines
The validity of each certification category is:
-
A-type approval: max. 5 years from
issuance date
-
B-type approval: max. 1 year from
issuance date
-
Prototypes and demonstration
max. 3 years from
issuance date
The wind turbine certificates can be linked to by the use of
a password, which is only passed on to national authorities, and local
system operators, grid and electricity supply companies.
-
A and B
certificates (large wind turbines)
-
Prototype certificates (large wind turbines)
-
§8 certificates
-
Small wind turbine certificates (under 25 kW)
-
Small wind turbines prototypes certificates
(under 25 kW)
-
Notified wind turbines under 5 m2
-
Expired certificates since 01/01/2005
|